Our Projects
Abu Skhair Barrage
The beneficiary: Ministry of Water Resources Contractor: KOOP INT BV & MIG Location: ALNAJAF Province Contract Value :87.000.000.000 Iraqi Dinar S.O.W / Complete The completion rate : 100%Completion date : 25/8/2019 The main Works carried out by MIG : 1- Civil Details drawings 2- Mechanical drawings 3- Site survey 4- 60,000 cubic meter reinforcement concrete 5- 2.400.000 cubic meter soil excavation 6- 350.000 cubic meter embankment 6- 350.000 cubic meter embankment 7- 160 meter length car bridge 8- 28000 Square meters concrete rood 9- 28000 Square meters asphalt rood 10- 10 units house 11- 1 Multi-storey office building 12- 1440 picas 12 meter length steel sheet pile 13- Dewatering system 14- 1100 Square meters warehouse building 15- 720 Square meters workshop building 16- Supply and install 62 unit office and living container 17- 3 unit concrete plant with capacity 100 cubic meter/ h 18- 1200 tones steel Gates( Radial , Miter and sliding gates with 24 set of stop log 19- 2 unit gentry crane with capacity of 22 tons 20- 2 unit monorails crane with capacity of 50 tons 21- Paving Stone thinks 1.5 M quantity 33000 Square meters
AL QAYARQ SELF SUFFICIENCY PROJECT
Beneficiary side: Ministry of construction & housing Contractor: Mubarak Int Group Ltd location : Numaniyah Provinces – Iraq Contract dollar value : 10,000,000$ S.O.W : To costruct concrete roads & yards including base coats (25000m2) . To contruct asphalt roads $ yards including base coats (20000m2) . To contruct concrete fence with total 1600 LM To contruct wearhouses with total area of 3250m2 To construct sewage &drinkable water systems . To construct electirical & michanical facilities for the project . To construct concrete patch plant to supply concrete & curbstone as per the requirements of the project . To construct multiperpose building as per the requirements of the project
WINDMILLS PROJECT
Beneficiary side: Department of defense US ARMY Contractor: Mubarak Int Group Ltd location : SALMANPAK - BAGHDAD - Iraq Contract dollar value: 1,000,000$ S.O.W: Supply and installation of six windmills to power six water pumps so the System will pump river water through it and into each canal system to provide Irrigation water to the people of the area.
Numaniyah Divisional Training Center, Iraq
Beneficiary side: USA ARMY Groups of Engineer Contractor: Mubarak Int Group Ltd. location: Numaniyah ( Wassit Provinces – Iraq ) . The Target of the project provide training facilities for Iraqi Military. Our works consisting of the following and all item In BOQ & SOW ( TURN KEY PROJECT) : Design. Including AutoCAD drawings and design calculations. Clear and grub the level of construction site. Supply and install the shoot house made of modular through-hardened armor steel panels with Brinell hardness rating of 500 and a thickness of no less than 3/8 inch. Construction of 6 m high Berms in a manner that surround the shoot house. Facilities on all four sides4-Site preparation. Construct 6m high berms quantities of 1200 LM. Construct 9m high beams quantities of 1400 LM. Construct Access and service roads quantities 40000 M². Construct 7000 M² Metal overhead sunshades. Construct 1000M² Sunshades/outdoor training Stage. Construct 1900M² OTFs Supply and install 4 each of security tower. Supply and install 7 each of power generator. Supply and install 3 bathrooms container trailer. construct 4 steel building used as storage for Iraqi army area approximately 3200 M² including all electrical and mechanical work and all civil work . Supply and install power transformer. Construct Full System COMBAT ASSAULT COURSE REQUIREMENTS. Construct Chain link fence 2200 ML. Target storage/admin building 3 EA. Construct range control towers 4 EA.
Dog Kennels
Reconstruction Iraqi Army building Has been damaged after the liberation of Iraq • Beneficiary side : USA Army • Prime contractor : KBR • Subcontractor : Al-Mubarak International Group • Location : Green Zone Area –Baghdad – IRAQ • Date of Start: 13/01/2005 • Reasons for Delay: change order to update the scope of work by the Clint • Subcontract No:02H8-US-SJ00048 • Project manager; H.Mubarak • Subcontract No : 02H8-US-SJ00048 • Contract value : $846.395.00 • Date of completion 13/06/2005 • Problems sat place of work: None • The Target of the Project • Subcontract No:02H8-US-SJ00048 • Project manager; H.Mubarak • Subcontract No : 02H8-US-SJ00048 • Contract value : $846.395.00 • Date of completion 13/06/2005 • Problems sat place of work: None • The Reinvasions &Construction of the old Building and adding new building in order to become 2 • building the first one for the dog kennels and the second for Ready for the dog Trainers service • facilities . • Our company has done and completed all Construction Building, Electrical works, Mechanical works • without the needs of the prime contractor or the needing the help of other subcontractors , we have • relied on our company cadres because of nature of the Green Area Securities implementations . • Our company has follows and implemented all security regulations also the HS & QC and to finish the • project in dead line time which was 120 days . • The work stages as the followings: • A-Civil works: • Demolishing of the damaged building. • Design &drawings. • Surveys and leveling site and Grading
Main Maintenance facility parking
The Target of the Project • Provide foundation for 2 part concrete paving the first part preparation of soil, provide, • grade and compacting sub base installation then concrete paving installing 8 in (20 cm ) • 4000 psi compressive strength concrete slab approximate area for 8 in 53,170 sqft (4949 • sqm) 2 layers of reinforcing steel .part tow pouring concrete 6 in (15) cm of 3500 psi • area approximate 20,350 sq ft (1,891sqm) designed .provide &install 3 sliding door in • the entrance . • Prime contractor : KBR • Subcontract No : 02H8-US-SJ00263 • Contract value: $329,000.00 • Date of completion 25/11/2005 • Beneficiary side : USA Army • Subcontractor : A- l Mubarak International Group • Location : International Zone Area –Baghdad – IRAQ • Date of Start: 1\10 \2005 • Duration :55 days • Civil works • site preparations • leveling of the site • concrete foundation • steel reinforcements work • Applying crashed stones on the floors • Mechanical works • Supply &Install (3) EA 6 m sliding door .
MRE Warehouse Renovation
• Civil &Mechanical works • supply& install interior sandwich panels walls with isolated temperature for area of • 360sqm and cover the hall building as well this to keep warehouse cooling temperature • constant. • supply &install 2 package unit with capacity of 25 tones LG Type • Supply & install from steel plates air distributions ducts with length of 200 ML with • installing of temperature isolators . • Supply & install 80 meters air distribution ducts extra to cover Mangers& staff offices • Supply& Install air distributors furnish and Install all roofs structural elements of the • building • require repair: beams, angle irons, roofing panels and drop ceiling framings
Fire Station Containers /Trailers
• Beneficiary side : USA Army • Prime contractor : KBR • Subcontractor : Al-Mubarak International Group • Location : International Zone Area –Baghdad – IRAQ • Subcontract No : GU68-CP-SG00636 • Contract dollar value : $400,000.00 • Date of Start: 27 \11 \2004 • Date of completion 18/02/2005 • Problems sat place of work: None • Reasons for Delay: Change order to update the Scope of work for addition of works • by the KBR . • The Target of the Project • This is to Supplied & install 15 prefabricate container trailer unites and all electrical work • , supply and install 28 split unit. Pluming and paving with slaps surrounded 15 trailers to • Accommodated 28 firemen's Our company has follows and implemented all security • regulations also the HS & QC and to finish the project in dead line time which is . • works stages • Civil works • site preparations • leveling of the site • constructing of concrete for the concrete stands • assembling of the prefabricate container trailer • installing of the prefabricate container trailer • Applying crashed stones on the floors • Painting interior of the Trailers
Adhaim Dam
The rehabilitation project for Adhaim Dam in Diyala Governorate, Iraq, with a total cost of 4,989,885,000 Iraqi dinars. is an ambitious project aimed at improving and developing the infrastructure of the dam. It includes several important works that will contribute to restoring life to this strategic dam. The project includes the following works: 1. Gates preparation and rehabilitation: This includes replacing old gates and equipping them with modern equipment to efficiently control water flow. 2. Hydraulic Power Unit preparation: This includes rehabilitating and equipping a modern Hydraulic Power Unit to control and secure the water flow in a smooth and sustainable manner. 3. Electrical works: The project includes preparing and rehabilitating the electrical systems associated with Al-Azim Dam, including installing flow measurement devices 4. Civil and mechanical works: This includes the necessary restoration and rehabilitation of the infrastructure of Al-Azim Dam, including mechanical structures and civil infrastructure. This project aims to rehabilitate Al-Azim Dam, improve its efficiency and sustainability, secure the necessary water supply for the surrounding areas, and support local development. We are confident that this project will contribute to improving the water infrastructure in the region and promoting sustainable development in Diyala Governorate. In the Al-Azim project, work has been carried out in three locations: INTAKE GATE: Installation and operation of a hydraulic unit for the valve, including preparation, installation, and testing of 2 hydraulic cylinders. Power and Irrigation: Preparation, installation, and operation of 2 hydraulic units for the valves, including cylinders. DIVERSION Tunnel: Preparation, installation, and operation of a hydraulic unit for the valve, including preparation, installation, and testing of 2 hydraulic cylinders. Preparation, installation, and testing of an 80-ton and 30-ton crane. Installation of sensors for reading water levels upstream and downstream, as well as sensors for measuring water flow.