MRE Warehouse Renovation

• Civil &Mechanical works • supply& install interior sandwich panels walls with isolated temperature for area of • 360sqm and cover the hall building as well this to keep warehouse cooling temperature • constant. • supply &install 2 package unit with capacity of 25 tones LG Type • Supply & install from steel plates air distributions ducts with length of 200 ML with • installing of temperature isolators . • Supply & install 80 meters air distribution ducts extra to cover Mangers& staff offices • Supply& Install air distributors furnish and Install all roofs structural elements of the • building • require repair: beams, angle irons, roofing panels and drop ceiling framings