Abu Skhair Barrage

The beneficiary: Ministry of Water Resources Contractor: KOOP INT BV & MIG Location: ALNAJAF Province Contract Value :87.000.000.000 Iraqi Dinar S.O.W / Complete The completion rate : 100%Completion date : 25/8/2019 The main Works carried out by MIG : 1- Civil Details drawings 2- Mechanical drawings 3- Site survey 4- 60,000 cubic meter reinforcement concrete 5- 2.400.000 cubic meter soil excavation 6- 350.000 cubic meter embankment 6- 350.000 cubic meter embankment 7- 160 meter length car bridge 8- 28000 Square meters concrete rood 9- 28000 Square meters asphalt rood 10- 10 units house 11- 1 Multi-storey office building 12- 1440 picas 12 meter length steel sheet pile 13- Dewatering system 14- 1100 Square meters warehouse building 15- 720 Square meters workshop building 16- Supply and install 62 unit office and living container 17- 3 unit concrete plant with capacity 100 cubic meter/ h 18- 1200 tones steel Gates( Radial , Miter and sliding gates with 24 set of stop log 19- 2 unit gentry crane with capacity of 22 tons 20- 2 unit monorails crane with capacity of 50 tons 21- Paving Stone thinks 1.5 M quantity 33000 Square meters